§ 18-56. Enumerated.  


Latest version.
  • (a)

    The permit fees for electrical projects in the village shall be calculated and paid as required by the most current village board resolution for electrical permit fees.

    (b)

    Charges for items not specified shall be set by the electrical inspector as needed.

    (c)

    The minimum permit fee, reinspection fee, and failure to call fee shall be set and paid as required by the most current village board resolution. Double fees are due if electrical work is commenced prior to issuance of a permit.

(Ord. No. 739, § I, 6-15-04)