§ 45-142. Survey monuments.
Latest version.
Before final approval of any plat within the corporate limits of the village, the subdivider shall install survey monuments, placed in accordance with the requirements of W.S.A., § 236.15, and as may be required by the village engineer. The planning commission may waive the placing of monuments, required under W.S.A., §§ 236.15(b), (c), and (d), for a reasonable time, on condition that the subdivider execute a surety bond to insure the placing of such monuments within the time required.
(Ord. No. 599, § 1(11-142), 5-6-97)